Caidian Street old community reconstruction project, involving these communities!

2022-08-05 0 By

Xiaobian to sort out some bidding project registration, specific as follows.The main construction contents include: (1) The north section of Lianfu Road (north of the road, south to 318 national road) is 267 meters long.29,500 square meters of building facade renovation, 4336 square meters of landscape reconstruction in the front area of the building, 4480 square meters of road maintenance and renovation, 410 square meters of new traffic lines, 13 status inspection Wells replacement lifting and strengthening, 36 status rainwater replacement lifting and strengthening and other ancillary projects, 229 meters of new telecommunication pipe group;(2) The south section of Mountain Street (north from 318 national Road, south to culture Street) is 322 meters long.3400 square meters of building facade renovation, 3,215 square meters of landscape reconstruction in front of the building, 4,017 square meters of road maintenance and renovation, 286 square meters of new traffic lines, 16 status inspection Wells replacement lifting and strengthening, 32 status rainwater replacement lifting and strengthening and other ancillary projects;(iii) The total length of the road on the east side of Sinopec Gas Station (from 318 National Road in the south to the parking lot of Shangshiqiao Road in the north) is 110 meters.546 square meters of road and 48 square meters of traffic line were repaired and renovated, 3 inspection Wells were replaced lifting and reinforcement, 11 rainwater outlets were replaced lifting and reinforcement, etc.The project cost is 31.4033 million yuan.Application for construction of 10 old residential area reconstruction projects in Caidian Street in 202210 residential areas around Lianhua Lake, Caidian District, Wuhan city (material dormitory, 447 Shufan Street, Dormitory of Ministry of Posts and Telecommunications, Dormitory of Finance Bureau, Transition room of Cotton Mill, Shipping dormitory, dormitory of Post Office of Telecom Bureau, Yellow House by Wenxing Garden (411 Shufan Street), municipal dormitory and timber dormitory) project Scale:The project plans to implement the 2022 renovation project of 10 old residential areas in Caidian Street, involving 10 residential areas with a total construction area of 764.7 million square meters, involving 769 households and 33 buildings.The main construction content is: building roofing waterproof reconstruction 3243 square meters, corridor repair wall painting 18388 square meters, top surface painting 4586 square meters;The slope roof of the building was rebuilt 3,876 square meters, and the external wall of the building was painted 18,710 square meters.1014 meters of fence were repaired;Renovation of sports and sports venues and paving 355 square meters;New fitness equipment 13 sets;Reconstruction of strong electric line 6890 meters;Install 73 street lamps;13 new charging piles for motor vehicles;Afforestation of 741 square meters;Weak current line 127,472 meters;Repair and replace downpipe 1,935 meters;76 sets of access control of building units were installed;Installation monitoring 148, etc.The total investment of the project estimate is 28,449,500 yuan.Nature of reconstruction Project Location: The construction site is difang Dormitory, No. 107 Hanyang Avenue, Caidian District, Wuhan City, Labor Bureau dormitory, Lianhua Lake Middle School dormitory, commercial fleet dormitory, aquatic product dormitory and other 6 residential areas project scale:This project plans to implement 6 old residential renovation projects in Caidian Street in 2022. The renovation project involves 6 residential areas, including Dike Dormitory, Hanyang Avenue 107, Labor Bureau dormitory, Lianhua Lake Middle School dormitory, commercial fleet dormitory and aquatic dormitory.The main construction content is: repair and replace downpipe 523 meters;1274 meters of strong current line (street lamp and charging pile cable), 37,954 meters of weak current line (monitoring, gate, access control fiber, four networks in one);Road reconstruction 3990 square meters;27 sets of access control of building units were installed;Building roof waterproof renovation 2625 square meters, corridor repair wall painting 3749 square meters, top painting 1357 square meters;The slope roof of the building was rebuilt 1805 square meters, and the external wall of the building was painted 1871 square meters.Installation monitoring 66;192 square meters of green planting, 180 meters of fence repair;57 street lamps were installed;8 new charging piles for motor vehicles;Four new fitness equipment with a total construction area of 16,900 square meters, involving 207 households and 10 buildings.The project estimates a total investment of 7.6939 million yuan.